Summary
Experience
Offshore Structural EngineerMcDermott International, Inc.
- Led structural design and analysis for 4 major deepwater projects, optimizing structural configurations to achieve a 15% reduction in material costs.
- Developed and implemented advanced fatigue analysis methodologies for subsea components, extending operational lifespan by an average of 20% across 3 critical assets.
- Managed a team of 3 junior engineers, overseeing project deliverables and ensuring strict compliance with API, DNV, and ISO standards.
- Provided key technical expertise during FEED and detailed design phases, contributing to a 10% reduction in overall project risk and schedule adherence.
- Authored comprehensive design reports and technical specifications for client and regulatory review, achieving 100% approval on first submission for 2 complex projects.
Marine Structural AnalystTechnipFMC
- Performed static and dynamic analysis of offshore platforms and mooring systems, validating designs against extreme weather conditions, resulting in a 5% improvement in safety factors.
- Utilized finite element analysis (FEA) software (ANSYS, ABAQUS) to model complex steel structures, identifying potential failure points and proposing mitigation strategies that saved approximately $500K in potential rework.
- Assisted in the development of installation procedures for subsea pipelines, contributing to the successful deployment of over 100 km of new infrastructure.
- Collaborated with naval architects and project managers to integrate structural designs with vessel capabilities, optimizing offshore installation schedules by 15%.
- Contributed to proposals and bids, providing technical input that helped secure 2 new project contracts valued at over $20M.
Projects
Deepwater Tie-Back Project (Gulf of Mexico)
- Directed the structural design verification for critical subsea manifold and jumper components, ensuring integrity under extreme cyclic loading.
- Implemented a new fatigue monitoring strategy that improved predictive maintenance capabilities by 25% for high-stress areas.
- Collaborated with fabrication yards to resolve design-for-manufacturability issues, reducing potential construction delays by 3 weeks.
Floating Production Unit (FPU) Mooring System Upgrade
- Developed and validated the hydrodynamic response model for a complex FPU mooring system, enhancing station-keeping reliability by 18%.
- Optimized anchor pattern and chain lengths, achieving a 7% reduction in material costs while maintaining safety factors.
- Provided offshore installation support, troubleshooting and resolving real-time operational challenges during mooring line deployment.
Subsea Pipeline Global Buckling Analysis
- Conducted comprehensive global buckling and walking analyses for a 150 km deepwater pipeline, ensuring stability and preventing potential failure modes.
- Proposed novel trenching and rock dumping strategies that reduced the need for costly subsea buckles by 30%.
- Presented findings and recommendations to client and regulatory bodies, securing approvals ahead of schedule.
Education
Texas A&M UniversityPh.D. in Ocean Engineering
- Thesis: "Advanced Fatigue Life Prediction of Deepwater Risers using Coupled Hydrodynamic-Structural Analysis."
- GPA: 3.8/4.0; Dean's List for four semesters.
University of HoustonM.S. in Civil Engineering (Structural Focus)
- Completed specialized coursework in advanced structural mechanics and finite element methods.
- Graduated with honors.
Publications
Improved Fatigue Life Prediction for SCRs in Deepwater Environments using Non-Linear FEA
Hydrodynamic Response Analysis of Articulated Towers under Extreme Wave Conditions
Optimizing Subsea Pipeline Stability through Advanced Geotechnical-Structural Interaction Modeling
Skills
Engineering Software
ANSYS (AQWA, Mechanical)ABAQUSSACSMOSESAutoCADSolidWorksPythonMATLABMathcad
Design & Analysis
Structural AnalysisFinite Element Analysis (FEA)Hydrodynamic AnalysisFatigue AnalysisRisk AssessmentReliability EngineeringGeotechnical Engineering
Project Management
Project PlanningCost ControlSchedule ManagementClient RelationsStakeholder ManagementTechnical DocumentationQA/QC
Regulatory & Standards
API RP 2A-WSDDNVGLISO 19901ABS RulesUSCG RegulationsHAZOPSIMOPS
Field Operations
Offshore InstallationMarine OperationsSubsea ConstructionInspection & MaintenanceAsset Integrity Management